How about we start at the same size warehouses that were part of the full planning submission by Peel when those houses were built and sold instead of the significantly bigger warehouses that were actually built, and adequate screening built to the same bund heights outlined in the earlier planning applications which were 2 to 3 times taller than what was actually built even considering that those plans were for lower warehouses, and any screening planted on proper topsoil, and proper drainage, and proper noise softening, and proper permanent noise restrictions put in place before operations started instead of months later because the residents had to pay for their own independent noise assessment. I think the residents would have preferred that, seeing as that's what Peel either promised/submitted planning for when those houses were sold or are basic common sense for any employment usage backing onto a residential development.